RavenOperational Decision Runtime

ICS and SCADA / Pilot

Controlled pilot path for ICS and SCADA

High fit, high risk. Enter through review and safety boundary only.

Safe start

Step 1Offline review or synthetic reference walkthrough.
Step 2Read-only pilot boundary with named roles and no automatic execution.
Step 3Decision packets validated by humans, then reports and production gaps.

Not yet included

  • OT lab validation
  • IEC 62443 mapping
  • MOC/change control
  • safety and shutdown authority

Required trust before production

  • NIST SP 800-82 mapping
  • IEC 62443 alignment
  • ISO 27001 readiness
  • OT tabletop

Back to briefing | Research Library | Pilot Framework