ICS and SCADA / Pilot
Controlled pilot path for ICS and SCADA
High fit, high risk. Enter through review and safety boundary only.
Safe start
Step 1Offline review or synthetic reference walkthrough.
Step 2Read-only pilot boundary with named roles and no automatic execution.
Step 3Decision packets validated by humans, then reports and production gaps.
Not yet included
- OT lab validation
- IEC 62443 mapping
- MOC/change control
- safety and shutdown authority
Required trust before production
- NIST SP 800-82 mapping
- IEC 62443 alignment
- ISO 27001 readiness
- OT tabletop